Road project S016270: SR 8/US 29 @ JOHN CARROLL RD CREATE RIGHT-IN/RIGHT OUT
Construction Work Program · Operational Improvement · Routes: 0000 · Cities: Lilburn · SR 8/US 29 @ JOHN CARROLL RD CREATE RIGHT-IN/RIGHT OUT
Latest cited records
Record date order · page 1
48 records in this page view
Construction Work Program · Operational Improvement · Routes: 0000 · Cities: Lilburn · SR 8/US 29 @ JOHN CARROLL RD CREATE RIGHT-IN/RIGHT OUT
Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Not City · Funding: NEPA · Construction of a 12-foot shared use path along west side of Satellite Boulevard from Sugarloaf Parkway to Old Peachtree Roa…
Construction Work Program · Operational Improvement · Routes: 0000 · Cities: Suwanee · I-85 NB @ GSP/HERO POST 51 INSTALL ON-RAMP
Construction Work Program · Signals · Routes: 0000 · Cities: Lawrenceville, Not City · Funding: NEPA · This project proposes to install pedestrian hybrid beacon (PHB) signals at two locations, SR 60 and Gwinnett Drive, i…
Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 316 FROM I-85 TO SR 120
Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 8 & SR 120 FROM LAMP POST ROAD TO SR 316
Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Buford, Duluth, Not City, Sugar Hill, Suwanee · SR 13 FROM ROGERS BRIDGE ROAD TO SAWNEE AVE
Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Tucker · Funding: NEPA · SR 10 FROM GOLDSMITH RD/DEKALB TO E PARK PLACE BLVD/GWINNETT
Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Chamblee, Doraville, Norcross, Peachtree Corners · SR 141 FROM N SHALLOWFORD RD/DEKALB TO SR 141 CONN/GWINNETT
Construction Work Program · Acceleration / Decel Lane · Routes: 0000 · Cities: Not City · SR 316 EB @ OAK VALLEY RD INSTALL ACCELERATION LANE
Construction Work Program · Transit Projects · FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC
Construction Work Program · Interchange · Routes: 0000 · Cities: Dacula, Not City · Funding: GEPA · A grade-separated interchange is proposed just east of the existing Williams Farm Dr and SR 316 at-grade intersection wi…
Construction Work Program · Shared Use Path · Cities: Duluth, Not City · The project is in the City of Duluth. It would construct a shared use path on the southside of State Route 120/Abbotts Bridge Road/Duluth Highway b…
Construction Work Program · Sidewalks · Cities: Peachtree Corners · 03/16/2026 Located in the City of Peachtree Corners, this project consists of filling two adjacent pedestrian network gaps along State Route 141 (Peacht…
Construction Work Program · Resurface & Maintenance · Cities: Lilburn, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 70 to improve the roadways current low…
Construction Work Program · Operational Improvement · Cities: Not City · SR 124 @ OLD FOUNTAIN ROAD
Under Construction · Signals · Cities: Not City · SR 8 @ POUNDS DR/BRAXTON PL INSTALL NEW SIGNAL
Construction Work Program · Concrete Rehab · Cities: Buford, Not City · I-985 FROM I-85 TO THOMPSON MILL ROAD
Construction Work Program · Widening · Cities: Loganville, Not City · SR 20 & SR 81 FROM SR 10/WALTON TO BRAND ROAD/GWINNETT
Construction Work Program · Multi-use Trail · Cities: Peachtree Corners · Funding: NEPA · The Crooked Creek Trail project proposed a 1.3 mile-long shared-use path along Crooked Creek from Spalding Drive to Peachtree Corn…
Construction Work Program · Shared Use Path · Cities: Suwanee · Funding: NEPA · The Suwanee Loop Trail consists of five segments of 8 to 12-foot-wide shared-use paths along local city roads and a pedestrian/bicycle bridg…
Construction Work Program · ITS · Cities: Not City · Funding: NEPA · This project proposes an ITS improvement along SR 124 From SR 20 to the Barrow County Line in Gwinnett County. This project is phase I of II, project 0…
Construction Work Program · Concrete Rehab · Cities: Buford, Flowery Branch, Gainesville, Not City, Oakwood · I-985 FROM I-85/GWINNETT TO SR 369/HALL
Construction Work Program · Resurface & Maintenance · Cities: Braselton, Not City · I-85 FROM N OF I-985 TO JACKSON COUNTY LINE
Under Construction · UNKNOWN · Cities: Buford · SR 13 @ Lee St - Install Dual SB Left Turn Lanes
Construction Work Program · Bridges · Cities: Gainesville, Lawrenceville · Funding: NEPA · Bridge Preventative Maintenance. The work will consist of deck preservation, replacement of edge beams, joint replacement, spall …
Under Construction · ITS · Cities: Bethlehem, Dacula, Lawrenceville, Not City, Statham, Winder · Funding: GEPA · This project would update both shoulder-mounted and overhead exit signing with mile post overlay along Stat…
Construction Work Program · Widening · Cities: Duluth, Johns Creek, Not City · Funding: NEPA · This project was originally programmed to widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to P…
Construction Work Program · Shared Use Path · Cities: Johns Creek, Not City, Peachtree Corners · The project intends to build a 12-ft-wide pedestrian bridge. The proposed bridge connects the west side of Jones Bridge Par…
Construction Work Program · Roadway Project · Cities: Dacula, Not City · Funding: GEPA · The proposed length of this project is approximately 0.7 miles. The existing right-in/right-out at-grade intersection with SR 316 E…
Construction Work Program · Resurface & Maintenance · Cities: Duluth, Norcross, Not City, Peachtree Corners · Funding: NEPA · SR 13 FROM DEKALB COUNTY LINE TO ROGERS BRIDGE ROAD
Construction Work Program · Resurface & Maintenance · Cities: Buford, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 70/SR 154 to improve the roadways curre…
Construction Work Program · Signals · Cities: Buford, Lawrenceville, Norcross, Not City, Peachtree Corners · Funding: NEPA · This project proposes to install signals at the below locations in Gwinnett county. SR 13/Bufor…
Construction Work Program · Signing · Cities: Not City, Scottdale, Tucker · SR 10/SR 410/US 78 @ 9 LOCS - SIGN UPGRADES
Construction Work Program · Scoping · Cities: Lawrenceville, Not City · Funding: NEPA · This project covers scoping activities for a widening of Sugarloaf Parkway from SR 124 to Old Norcross Road.
Construction Work Program · RRX Scoping · Cities: Duluth · SR 120 @ NS #717840T IN DULUTH - SCOPING ONLY
Under Construction · RRX Scoping · Cities: Peachtree Corners · AMWILER ROAD @ NS #717880R IN PEACHTREE CORNERS-SCOPING ONLY
Construction Work Program · RRX Scoping · Cities: Sugar Hill · LANIER AVE @ NS #717828L IN SUGAR HILL - SCOPING ONLY
Under Construction · RRX Scoping · Cities: Peachtree Corners · JONES MILL ROAD @ NS #916933L IN PEACHTREE CORNERS - SCOPING
Under Construction · Resurface & Maintenance · Cities: Norcross, Peachtree Corners · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 141 to improve the roadways current…
Under Construction · Resurface & Maintenance · Cities: Not City, Suwanee · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 403 to improve the roadways current low OCI s…
Under Construction · Resurface & Maintenance · Cities: Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 403 (I-85) to improve the roadways current low OCI sco…
Under Construction · Resurface & Maintenance · Cities: Norcross, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 403(I-85) to improve the roadways current lo…
Under Construction · Bridges · Cities: Not City, Suwanee · Funding: NEPA · Bridge Rehabilitation Project. The work will consist of deck rehab with LMC overlay, deck replacement with precast panels, edge beam replacement,…
Under Construction · Bridges · Cities: Not City · Funding: NEPA · I-85 @ 4 LOCS IN GWINNETT COUNTY - BRIDGE PRESERVATION. The work involves Bridge Preservation – Polymer Overlay, Painting of the Superstructure, and repla…
Construction Work Program · Bridges · Cities: Norcross, Not City, Peachtree Corners · Funding: NEPA · The work involves Bridge Preservation – Polymer Overlay, Painting of the Superstructure and Substructure, and replacem…
Construction Work Program · Turn Lanes · Cities: Norcross, Not City · SR 378@SR 403/I-85 EXT LT TURN LN
Construction Work Program · Turn Lanes · Cities: Not City · SR 13@CR 5/S SCALES RD ADD LT TURN LN