Road project T006844: FY 2023-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2023 for the Gainesville urbanized area.
Latest cited records
Record date order · page 19
48 records in this page view
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2023 for the Gainesville urbanized area.
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2022 for the Gainesville urbanized area.
Under Construction · Widening · Cities: Flowery Branch, Not City · Funding: NEPA · Project P.I. no. 0009679 proposes to widen CR 1287 / Spout Springs Road from a 2-lane roadway to a 4-lane divided roadway with a 20 foot …
Under Construction · Widening · Cities: Canton, Not City · Funding: GEPA · The proposed project will widen SR 20 to six lanes with a 20’ raised median in central Cherokee County, partially in the City of Canton. The proj…
Under Construction · Roundabout · Cities: Not City · Funding: NEPA · The project is located in Forsyth County at the existing three-leg intersection between State Route 9 (Dahlonega Highway) and County Road 3705 (A.C. Sm…
Under Construction · Turn Lanes · Cities: Not City · Funding: NEPA · This project will add a two-way left turn lane on SR 140 (Hickory Flat Highway) at the intersection of Avery Road. The two-way left turn lane was recom…
Under Construction · Operational Improvement · Cities: Atlanta · Funding: NEPA · The proposed project extends approximately 0.3 miles along SR 42/Moreland Avenue from SR 154/Memorial Drive SE to Faith Avenue SE/McPherson…
Under Construction · Multi-use Trail · Cities: Not City, Woodstock · Funding: NEPA · The proposed Noonday Creek Trail Extension will be a continuous 10’ wide concrete multi-use path that begins at Noonday Creek Park in n…
Under Construction · Multi-use Trail · Cities: Not City, Woodstock · Funding: NEPA · The proposed Noonday Creek Trail Extension will be a continuous 10’ wide concrete multi-use path that begins at Noonday Creek Park in n…
Under Construction · Shared Use Path · Cities: Atlanta · Funding: NEPA · This project would provide pedestrian safety improvements and a multiuse trail on Lenox Road between SR 141 (Peachtree Road) and East Paces Ferry R…
Under Construction · Sidewalks · Cities: Atlanta · Funding: NEPA · This project addresses safety & connectivity at one of the region's most heavily used corridors adjacent to the Georgia World Congress Center (GWCC) camp…
Under Construction · Multi-use Trail · Cities: Atlanta · Funding: NEPA · The regional trail vision seeks to develop a connected regional trail network - including providing the opportunity to provide access to major empl…
Under Construction · Preliminary Engineering · Cities: Marietta, Not City, Smyrna · Funding: NEPA · This project will widen Cobb Parkway (US 41) from four to six lanes between Windy Ridge Parkway to SR 120 Lopp. The proj…
Construction Work Program · Rural Transit - Capital/Ops · FY 2019-CHEROKEE COUNTY-SEC.5311-REPLACEMENT VEHICLE
Under Construction · Bicycle/Ped. Facility · Cities: Fairburn · Funding: NEPA · The project includes streetscape enhancements along US 29 from Malone Street to approximately 175 ft north of Strickland Street. US 29 will …
Under Construction · Bicycle/Ped. Facility · Cities: Atlanta · Funding: NEPA · The project will address sidewalk improvements. It will include installation of a furniture zone with street trees & pedestrian scale lightin…
Under Construction · Bridges · Cities: Not City · Funding: NEPA · The proposed project is to construct a 482 foot long bridge to replace the existing SR 136 bridge over the Chestatee River. The project proposes to realig…
Under Construction · Bridges · Cities: Not City · Funding: NEPA · The proposed project is to construct a 482 foot long bridge to replace the existing SR 136 bridge over the Chestatee River. The project proposes to realig…
Under Construction · Widening · Cities: Not City · Funding: GEPA · The SARDIS ROAD CONNECTOR is the widening and reconstruction of several existing local roads and streets with some new roadway on new alignment. This pro…
Under Construction · Bridges · Cities: Gainesville · Funding: NEPA · This project will replace the existing bridge that was built in 1967 over I-985 in Gainesville. The proposed bridge will be 250 feet long, consisting o…
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2022 for the Atlanta MPO (ARC). ***[ARC operates on a calendar year]
Construction Work Program · Bridges · Cities: Milton · Funding: NEPA · Bridge replacement project of CS 1323/Hopewell Road bridge over Chicken Creek in Milton located approximately 5.8 miles north of Alpharetta. The tota…
Under Construction · Bridges · Cities: Not City · Funding: NEPA · The project consists of the replacement of the SR 136 bridge over Toto Creek (Lake Lanier) near Dawsonville, GA. The existing bridge will be closed during…
Under Construction · Operational Improvement · Cities: Milton · Funding: NEPA · The proposed project would construct a roundabout at the intersection of SR 372 and Birmingham Road in Fulton County. The roundabout would p…
Under Construction · Resurface & Maintenance · Cities: Not City, Union City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 14 to improve the roadways current low PAC…
Under Construction · Bicycle/Ped. Facility · Cities: East Point · Funding: NEPA · This project proposes to implement streetscaping, gateway features, place-making, traffic calming, and multi-modal connectivity elements i…
Construction Work Program · Airport · Cities: Kennesaw · ATLANTA – RYY – TWY B AND S APRON CS AND REM
Under Construction · ITS · Cities: Dacula, Not City · Funding: NEPA · This project will replace the existing 24 SM fiber on Sugarloaf Pkwy east of SR 20 with a 144 SM fiber along Sugarloaf Pkwy from SR 20 (Grayson Hwy) t…
Under Construction · ITS · Cities: Not City · Funding: NEPA · This project will install a new 72 SM trunk fiber along SR 120 (Duluth Hwy) from Sugarloaf Pkwy to Riverside Pkwy, and connect all the signals and cameras alo…
Under Construction · ITS · Cities: Lilburn, Not City · Funding: NEPA · This project will install a new 72 SM trunk fiber along Arcado Road between US 29 (Lawrenceville Hwy) to Killian Hill Road. It will turn down Killian…
Construction Work Program · Airport · Cities: Atlanta · FAA GRANT 3-13-0000-007-2018
Construction Work Program · Airport · Cities: Lawrenceville · LAWRENCEVILLE – CONST TWY Y REALIGN AND EXT
Under Construction · Realignment · Cities: Sandy Springs · Funding: NEPA · The purpose of the project is to realign Glenridge Dr. so that it will line up with a nearby condominium complex’s driveway. This will change the…
Construction Work Program · Airport · Cities: Gainesville · GAINESVILLE – RUNWAY 23 SAFETY IMPROVEMENTS, PHASE 2
Under Construction · Transit Projects · COBBLINC WEEKEND TRANSIT SERVICE
Construction Work Program · Airport · Cities: Canton · CANTON – AIRFIELD CRACK SEAL AND REMARKING
Under Construction · Bicycle/Ped. Facility · Cities: Duluth, Not City, Suwanee · Funding: NEPA · The Western Gwinnett Bikeway multi-use trail begins from approximately 2,500 feet west of Rogers Bridge Road to McGinnis Fe…
Under Construction · Preliminary Engineering · GAINESVILLE HALL MPO JACKSON CTY TRANSP MASTER PLAN UPDATE
Construction Work Program · Airport · GDOT AIRFIELD PAVEMENT MGMT SYSTEM UPDATE
Under Construction · ITS · Cities: Not City · Funding: NEPA · This project will install a new 72 SM trunk fiber along SR 20 (Loganville Hwy) from Ozora Rd to Brand Rd, and connect all the signals and cameras along this r…
Under Construction · Scoping · Cities: Atlanta, East Point · Funding: NEPA · This project includes a study for an intersection improvement project at WELCOME ALL ROAD & WELCOME ALL ROAD CONN - STUDY
Construction Work Program · Airport · TO #4-UPDATE GDOT DBE PLAN
Construction Work Program · Transit Projects · Cities: Atlanta · Transit Compliance Consultant RFP Contract
Construction Work Program · Rural Transit - Intercity Bus · Cities: Atlanta · The project description in the Atlanta Regional Commission's (ARC) Transportation Improvement Program (TIP) is as follows: "Greyhound Atlanta …
Under Construction · Operational Improvement · Cities: Woodstock · Funding: GEPA · The proposed project would create dual left turn lanes from SR 92 Eastbound to Neese Road. To do this, an additional receiving lane would…
Construction Work Program · Harbor · TO#2 - WATERWAYS - STAFF EXTENSION -1/19/18 - 1/18/19
Under Construction · Widening · Cities: Cumming · Funding: GEPA · This project proposes to widen SR 20 from west of Post Road to east of N Corners Parkway in Forsyth County. The project will widen SR 20 to six lanes (thr…
Under Construction · Bridges · Cities: Not City · Funding: GEPA · The project proposes to widen SR 92/Lake Acworth Drive from US 41/SR 3/Cobb Parkway to Glade Road to a divided 4-lane facility with 11-foot lanes on the i…