Dawson TSPLOST project 70: SR 9 @ Thompson Road
The public point layer states a project number and road only; no phase or date is published.
Latest cited records
Record date order · page 37
48 records in this page view
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
The public point layer states a project number and road only; no phase or date is published.
Phase: DESIGN. Project type: Parks. Trail Master Plan
Phase: CST. Project type: Shared-Use Path. Adds separate bicycle and pedestrian infrastructure from the Johnson Ferry/Mt Vernon intersection to the Sandy Springs MARTA station; includes a transit feasibility study and po…
Phase: CST. Project type: Road Earmark. Two grid alternatives are proposed, with both alternatives creating two separate east | west corridors that can operate independently of each other. Sidewalks and enhanced pedestri…
Phase: DESIGN. Project type: Bicycle and Pedestrian. Peachtree Dunwoody Road from Hammond Drive to Mt. Vernon Highway. Proposed improvements include separated bicycle and pedestrian sidepaths on one side of the street.
Phase: STUDY. Project type: Study. Staff met with neighborhood representatives in Derby Hills, Spalding Lake, and on Huntley Drive/Brinkley Lane to discuss the neighborhood traffic calming program. Schedule Traffic Calmi…
Phase: DESIGN. Project type: ITS.
Phase: DESIGN. Project type: ITS. Signal analysis, ADA upgrades, and signal plan for 5 intersections (Dunwoody Place/Hope; SR9/Northridge; SR9/Trowbridge; Hammond/Lake Forrest; Hammond/Sandy Springs Circle)
Phase: DESIGN. Project type: ITS. Signal analysis, ADA upgrades, and signal plan for 5 intersections (Dunwoody Place/Hope; SR9/Northridge; SR9/Trowbridge; Hammond/Lake Forrest; Hammond/Sandy Springs Circle)
Phase: DESIGN. Project type: ITS. Signal analysis, ADA upgrades, and signal plan for 5 intersections (Dunwoody Place/Hope; SR9/Northridge; SR9/Trowbridge; Hammond/Lake Forrest; Hammond/Sandy Springs Circle)
Phase: DESIGN. Project type: ITS. Signal analysis, ADA upgrades, and signal plan for 5 intersections (Dunwoody Place/Hope; SR9/Northridge; SR9/Trowbridge; Hammond/Lake Forrest; Hammond/Sandy Springs Circle)
Phase: STUDY. Project type: Transportation. City has issued a task order under the Traffic Engineering On-Call Services to undertake an evaluation of the intersection at Spalding Drive at Nesbit Ferry Road. The project w…
Phase: STUDY. Project type: Transportation. City is reviewing this intersection for short-term safety improvements
Phase: DESIGN. Project type: Intersection Improvement. The City has selected a consultant to undertake improvements recommended in the North End Safety Study at the interchange at SR 400 and Northridge Road.
Phase: DESIGN. Project type: Intersection Improvement.
Phase: STUDY. Project type: Transportation. Traffic engineering study of the intersection of Glenridge Drive at Johnson Ferry Road/Glenairy Drive to identify operational and safety improvements.
Phase: DESIGN. Project type: Sidewalk.
Phase: CST. Project type: Sidewalk.
Phase: DESIGN. Project type: Sidewalk.
Phase: DESIGN. Project type: Sidewalk.
Phase: DESIGN. Project type: Sidewalk. East side with 6' SW, 5' LS; assuming the ROW dedication by Palisades is complete.
Phase: STUDY. Project type: Study. Sandy Springs is participating in a transportation plan with the north Fulton Cities of Alpharetta, Johns Creek, Milton, Mountain Park and Roswell in coordination with the Atlanta Regio…
Phase: CST. Project type: Shared-Use Path. Construction of multi-use trail from City Limits to I-285/400 interchange trail.
Phase: STUDY. Project type: Slope Stabilization. East side of Lake Forrest Drive to just south of Maryeanna Drive.
Phase: CST. Project type: Slope Stabilization. East side of Lake Forrest Drive to just south of Maryeanna Drive.
Phase: STUDY. Project type: Study. Safety and operational improvements on Roswell Road.
Phase: DESIGN. Project type: Intersection Improvement.
Phase: CST. Project type: Intersection Improvement.
Phase: STUDY. Project type: Transportation. Improve safety, mobility and pedestrian/bicycle access along Peachtree Dunwoody Road.
Phase: STUDY. Project type: GDOT Project.
Phase: DESIGN. Project type: Road Widening / Streetscape. Bicycle and pedestrian infrastructure on Peachtree Dunwoody Rd, Lake Hearn Dr, Perimeter Center Pkwy, and Hammond Dr, and intersection modifications at Peachtree …
Phase: CST. Project type: Mid-block Crossing. Installing a controlled pedestrian mid-block crossing at the Fulton County Annex
Phase: CST. Project type: Bridge Enhancements. GA 400 Bridge Enhancements at Roberts Drive, Pitts Road and Spalding Drive
Phase: DESIGN. Project type: ITS.
Phase: CST. Project type: Shared-Use Path. Construction of multi-use trail from City Limits to I-285/400 interchange trail.
Phase: CST. Project type: Shared-Use Path and Streetscapes. The project will add streetscape on Boylston Drive and realign the intersection at Hammond Drive to remove offset.
Phase: CST. Project type: Shared-Use Path. The project will construct a 12'-wide multiuse trail from the Glenridge Connector to Peachtree Dunwoody Road in Georgia DOT right-of-way as part of PI 0000784, I-285/SR 400 inte…
Phase: DESIGN. Project type: Sidewalk. Install sidewalk from existing sidewalk on Long Island Drive to existing sidewalk to Roswell Road.
Phase: CST. Project type: Sidewalk. Provide ADA compliant sidewalk from Northwood Drive to Roswell Road and Install a Pedestrian Crossing at Kingsport Drive to Northwood Park (We don't want to say the width)
Phase: CST. Project type: Sidewalk. The project will add sidewalks, streetscape, trees and pedestrian lighting on the west side of Roswell Road/SR 9.